Cpd st p and p
New skill learning and active practice implementing knowledge at major water company.
Self-led research and learning into DfMA and MCC
Project work with Aqua and Severn Trent Water
Delivering innovation through modular solutions for AMP8 programme.
1. Literature review, market research, subject matter expert consultations with engineers for Yorkshire Water, Wessex Water, Anglian Water, UU and Southern Water, discussions with relevant suppliers arising from desk top study into modular, prefabricated and plug and play asset options for wastewater treatment, water supply network monitoring, predictive maintenance and renewable power options to support SPS and assets experiencing black and brown out.
2. Site visit to innovative modular STW at Severn Trent Water’s new STW at Lower Moor. Modular PST, SAFs and HSTs all designed within shipping containers on rollers, known as RORO. Expert guidance by Severn Trent’s principal engineer and delivery manager.
3. Capital delivery and whole life costings for Severn Trent on modular options for storm water storage, peak flow equivalent treatment, prefabricated inlet facilities, stand alone renewable power and hydro powered energy production from sewage flow - post inlet with archimedes screw and post outfall with water wheel or dynamo/turbine.
4. Review of AMP8 projects for ST water to select specific pr24 projects suited to modular storm water storage and pfet and inlet facilities. Proposed to ST size of and costings for modular prefab programme component of pr24 projects.
Storm investment is £1.3 billion. Inlet facilities investment is £11.5 million.
Savings proposed total £ 9.5 million
Comments
Post a Comment