Leighton Linslade 230 l/s
Josh Cartwright
Angus Outram
Gareth Stewart EPS
Ollie Weir.
4mg/l Fe, P 0.25mg/l
Dual Stream
Inlet → Scrapers → 0000 TF and Ditch via letterbox splitter
↓
Sludge
→ HSTs → FE
SAS – not usually co-settled
in primary
High P ~ 4 mg/L
so ceased co-settling
→ More sludge – thinner
more watery
P consent is 2 mg/L annual
average OSM
Fixed dose Ferric
would be better to be
flow proportional.
Thin sludge – too much
Thickener was PFT NOW SHT - fix to reduce sludge volume and so tankering
5 Arctics a day for sludge movement : £30-40k a month
100 m³/day of sludge –
needs moving or cannot
desludge PSTs ammonia off ditch → 8 mg/L
– Need a thickener – Belt or Drum
P scheme will include
Enough Sludge Storage
for additional that
Scheme produces only.
2 disused digesters
– Solid concrete tank –
available for expensive
repurposing.
Naylor / Heather + Ops / Capital team.
→ Opportunity to work together
combined with P Scheme
Chemical dosing post EoWL.
2 x 30 m³ tanks, 30–40 yr old.
(Old) Shower with potable feed.
Need a TSR – there is
space on site. Could use
old SF/UV building.
Kris Still
21-day batch tanks have been
repurposed to storm tanks.
Huns, Retains well P/S
On corner of Big Road
Recirc Huns tank to head
of works to improve
TN / ammonia. Trim dosing
• mag abs into here
Notes:
• THt = likely Tanker Handling Tank / Thickener Tank
• EoWL = End of Waste Water Line / Final Effluent
• TSR = Technical Safety Report / Site Record
• SF/UV = Sand Filter / Ultraviolet building
• P/S = Phosphorus/Sulphur or Pressure System
• TN = Total Nitrogen
• mag abs = magnesium absorption